Sub Station No.164
Project Overview: Sub Station – Clarence Street
A two-level interior upgrade focused on detailed painting and timber finishing works across Levels 11 and 12 of the Sub Station building. The project included the treatment of walls, ceilings, doors, and bespoke finishes to integrate seamlessly with modern refurbishments.
Scope of Works
Level 11
Paint to plasterboard perimeter ceiling and main ceiling
Paint to internal walls
Paint to doors and frames
Timber stain to doors and frames for a high-end architectural finish
Level 12
Paint to plasterboard and perimeter ceilings
Paint to new partitions, walls, and doors
Timber stain to selected doors and frames
Booster cabinet upgrade: ceiling and wall painted in black for functional design integration
Paint to service cupboard doors
Special Features
Timber Staining Works to enhance the appearance of high-traffic entry points
Functional Coating to booster areas and service cupboards to meet fire and operational standards
Seamless coordination across multiple levels with minimal disruption