25H Hotel in Paddington

25H Hotel in Paddington

Client

Richard Crookes

Client

Richard Crookes

Client

Richard Crookes

Type

Painting & Rendering

Type

Painting & Rendering

Type

Painting & Rendering

Year

2025

Year

2025

Year

2025

Size

Initial Consultation

Size

Initial Consultation

Size

Initial Consultation

Location

1-11 Oxford Street Paddington NSW 2021

Location

1-11 Oxford Street Paddington NSW 2021

Location

1-11 Oxford Street Paddington NSW 2021

Services

Painting & Rendering

Services

Painting & Rendering

Services

Painting & Rendering

Status

In Progress

Status

In Progress

Status

In Progress

Project Overview: Base Build and Fit-Out Painting & Rendering Works

This comprehensive project covered external and internal painting, rendering, and finishing works across various levels of the development. The scope included base build upgrades, decorative finishes, and fit-out enhancements, delivering both functional and aesthetic outcomes.

External Works:

  • Painting applied to the external façade to align with the architectural finish.

  • Rendering of the southern elevation façade for improved durability and texture.

  • Surface preparation of the eastern elevation to ensure long-term coating adherence.

Internal Works – Base Build:

Basement 2:

  • Full internal wall painting including skirting boards.

  • Application of sealer to exposed concrete, blockwork, and brick surfaces.

  • Ceiling painted using PB system.

  • Doors and frames finished with high-quality coatings.

Basement 1:

  • Internal wall paint and skirting treatment.

  • Sealer application to exposed structural surfaces.

  • Stucco finishes (RCSS1) applied to walls and selected columns.

  • PB Ceiling painted throughout.

  • Paint to doors and frames.

Ground Floor:

  • Paint to internal walls and PB ceiling.

  • Stucco finishes (RCSS2) on walls and columns.

  • Sealer and paint application to exposed columns and walls.

  • Additional finishes include epoxy flooring allowance and smooth render for the Wall of Fame.

  • Paint to thermal rigid insulation.

  • Doors and frames finished.

Levels 1–4 (Guest Rooms & Corridors):

  • Full internal wall paint across guest room levels.

  • Sealer applied to exposed block and concrete walls.

  • PB ceilings painted throughout.

  • Paint to balcony soffits.

  • Columns sealed and painted.

  • Finishes to doors and frames.

Level 5:

  • Painting to PB ceilings, completing vertical finish continuity.

Fit-Out Works – Ground Floor and Level 5:

Ground Floor:

  • Microcement render applied to existing brickwork and PB walls, including above tile areas.

  • Internal walls and PB ceilings painted.

  • Wallpaper installed as a design enhancement.

  • Paint applied to doors, frames, and pressed metal ceilings.

Level 5 – Roof:

  • Paint and sealer applied to PB/concrete walls.

  • Ceilings painted with appropriate finishes.

  • Paint applied to doors and frames.

Additional:

  • Optional works performed during night shifts to minimise disruption.

  • Feature wallpaper installation to guest rooms, including Renegade and Dream schemes across various levels.

  • Cost-saving options available through lime wash finishes in place of microcement renders.

  • Skim coating of external northern and western walls for improved surface quality.

Project shots

Project shots

Project shots

Other Projects

Other projects you may feel inspiring

Other Projects

Other projects you may feel inspiring

Other Projects

Other projects you may feel inspiring