Canberra Hospital Building 8 Expansion
Project Overview
This project involved specialised painting works within the Operating Theatres (OT1 & OT2) and CSSD upgrades at Canberra Hospital’s Building 8 Expansion. The works supported critical healthcare operations and included high-grade finishes in sensitive sterile environments, contributing to the upgrade of clinical spaces.
Scope of Works
Painting services included application of epoxy coatings and standard finishes to new and existing surfaces within OT1, OT2, Sterile Stock Room, and CSSD areas. Works covered plasterboard ceilings, internal walls, and doors/frames, following extensive preparation and sealing protocols. All painting was carried out with strict compliance to hygiene standards and operational constraints, including dustproofing and coordination with medical equipment installations.